That Time When The White House Was Condemned, Gutted, and Sold as Souviniers

The Hidden White House: Harry Truman and the Reconstruction of America’s Most Famous Residence by Robert Klara was is about the 1949-53 rebuilding of the president's mansion, revealing its secrets while offering an interesting view of President Truman's character.

It was fascinating to learn that the building was literally falling apart because earlier restorations had left original beams that had been burned in the 1812 fire! Over the years, modernization to add heating, gas, electric, and plumbing cut into beams and retaining walls. The original footing was never meant to hold the expanding house. The house, after all, was built in a swamp.

President Truman and his family moved into a haunted house, footsteps and noises heard at night. Actually, it was the wood expanding and contracting with temperature changes. And when the president moved his huge desk and books into his study, a few visitors more stressed the floor beams. Truman and his daughter Margaret had their pianos sitting side by side for family musicals. It was all too much for the old house to handle.

It was time to check things out, a fifty-year check up as it were since it was last remodeled under President Teddy Roosevelt.

The structure was found to be so bad that the building had to be gutted to the sandstone outer walls! And even they were falling apart in places.

Meantime, the economy was adjusting from WWII and the Korean conflict was beginning. Getting money out of Congress was a battle, and so was every decision down to the wallpaper. The original wood trim, windows, fireplaces, and wood panels were sent into storage but proved too costly to restore; it was cheaper to make new. Sovineer relics were sold to raise money. And tons of the house were repurposed at other federal buildings--and sent to the dump.

President Truman and his family were relegated to Blair House, which proved insecure when an assassination attempt caused the death of several guards. He drove the security people mad by insisting on walking to work every day.

The president pushed to get the work done quickly, hoping to live a year in the new house. But haste made waste--and mistakes. Three years and $5.8 million later, the house was finished. The sewing room lacked electric outlets. Only four rooms were refitted with their original interiors. Everyone was finding fault.
Eleanor Roosevelt pronounced that the house looked like a Sheridan hotel! The mass-produced furniture was all that could be afforded. No wonder Jackie Kennedy pressed to restore the decor to original pieces.

There is nothing worse than a job coming with a house. You never know what you are going to get. As a clergy wife, for me it was parsonages that flooded, had cockroaches and mice, rattling drafty windows, iced over closets in winter, water that turned whites orange, and an antique pink refrigerator.

For the Trumans, there were rats, worn out carpets and furniture and drapes, and a house in danger of collapse. Plus three years in temporary housing that was inadequate in every way. I had it better.

I enjoyed learning about the people involved and the history and process of the rebuilding. It was an enjoyable read.